Kitchen Renovation in Port Perry
Cabinets, counters, backsplash, flooring and lighting, with plumbing and electrical done before the walls close.
About this job
A kitchen renovation is the job we are asked about most in Port Perry. Many kitchens here are closed off from the rest of the main floor, with oak or thermofoil cabinets and too few circuits for modern appliances. We plan the layout with you, open walls where it makes sense, bring the plumbing and electrical up to code, and install cabinets, counters, backsplash, flooring and lighting.
What's included
- Layout drawing and a written scope before demolition
- Demolition and disposal of the old kitchen
- Plumbing rough-in for the sink, dishwasher and fridge water line
- Electrical rough-in: appliance circuits, counter outlets, pot lights
- Drywall, priming and paint
- Cabinets, countertops, backsplash and flooring installed
- Sink, faucet, lighting and appliance hook-ups
Your written quote lists exactly what your job includes.
In Port Perry and Scugog homes
- Many Port Perry kitchens in 1970s to 1990s houses sit behind a wall from the family room. If you want it opened up, we check whether the wall is load-bearing before quoting.
- Older houses often need a panel upgrade or new circuits to run an induction range, a dishwasher and a microwave at once. We look at the panel during the visit and price it up front.
- In homes on a private well, we can add the water treatment line or a filtered tap when the plumbing is open.
Typical timeline
- Day 1–3Demolition and haul-away
- Day 4–8Plumbing and electrical rough-in, inspections
- Day 9–12Drywall, paint and flooring
- Day 13–17Cabinets installed, countertops templated
- Day 18–25Countertops, backsplash, fixtures and walk-through
Working days once permits are issued and materials are on site. Special-order materials, permits and inspections can add time.
Kitchen Renovation: common questions
How much does a kitchen renovation cost in Port Perry?
A full renovation of an average kitchen in Durham Region usually lands between $30,000 and $80,000. Cabinets and countertops are the biggest part; layout changes and electrical upgrades move the number most. You get a written price after we see the kitchen.
How long does a kitchen renovation take?
About five weeks of working days once cabinets are on site. Cabinets can take 6 to 10 weeks to arrive, so they are ordered early.
Do I need a permit for a kitchen?
Replacing cabinets, counters and finishes in the same layout usually does not need a building permit. Removing a load-bearing wall or moving plumbing usually does. Electrical work needs an ESA permit. We tell you which applies before the quote.
Often done together
Get a written quote for your project
Tell us the job and leave your number. We call back, come out to see the house, and give you the scope and price in writing before any work starts.
416-820-3775Call or text, or use the form and we call you back.
Request a quote
Takes a minute. Or call or text 416-820-3775.