
Bathroom Renovation in Port Perry
Full bathroom remodels, tub-to-shower conversions and new bathrooms, waterproofed properly behind the tile.
About this job
We take bathrooms back to the studs and rebuild them: new drains and supply lines, a waterproofed shower or tub surround, proper ventilation, tile, vanity, toilet and lighting. In older Port Perry houses that often includes fixing a soft subfloor or a fan that vents into the attic instead of outside.
What's included
- Demolition to the studs and disposal
- Subfloor repairs and leveling where needed
- Plumbing rough-in for the shower or tub, vanity and toilet
- Waterproofing membrane behind all shower tile
- Exhaust fan vented outside, GFCI outlets and lighting
- Tile, vanity, toilet, glass and accessories installed
- Final caulking, clean-up and walk-through
Your written quote lists exactly what your job includes.
In Port Perry and Scugog homes
- Adding a bathroom in a home on septic usually needs a review from the Region of Durham Health Department before the Township of Scugog issues the permit. We start that early.
- Old cottages and older farmhouses often have bathroom fans that vent into the attic, or none at all. We run the duct outside so moisture does not end up in the roof.
- Hard well water leaves scale on glass and fixtures. We can suggest finishes and glass coatings that are easier to keep clean.
Typical timeline
- Day 1–2Demolition and subfloor repairs
- Day 3–5Plumbing and electrical rough-in
- Day 6–8Cement board and waterproofing
- Day 9–13Tile and grout
- Day 14–17Vanity, toilet, glass, fixtures and walk-through
Working days once permits are issued and materials are on site. Special-order materials, permits and inspections can add time.
Bathroom Renovation: common questions
How much does a bathroom renovation cost?
A full renovation of a standard bathroom in Durham Region usually costs $15,000 to $40,000. Moving the toilet or shower, heated floors, custom glass and large-format tile push it higher. You get a written price after we see it.
How long does a bathroom renovation take?
About three to four weeks of working days for a standard bathroom, once the tile and fixtures are on site.
Can you add a new bathroom to my house?
Yes. We find a spot that can be drained and vented, handle the permits, and if the house is on septic, get the Region of Durham Health Department review done before the building permit.
Often done together
Get a written quote for your project
Tell us the job and leave your number. We call back, come out to see the house, and give you the scope and price in writing before any work starts.
416-820-3775Call or text, or use the form and we call you back.
Request a quote
Takes a minute. Or call or text 416-820-3775.


